Construction & Development template

Daily Labour Report for Construction Sites

Knowing how many workers each contractor actually put on site is the basis for billing, planning and spotting a slowdown early. This form has the site engineer pick the building, then enter today’s labour count for each trade: excavation, RCC, fire fighting, electrical, waterproofing, tiling, windows and doors, painting, plumbing, facade and cladding, lifts, solar, scaffolding and more.

A trade with no one on site that day can be skipped, so the report takes only as long as the work in progress.

38

Questions

One at a time

Form

No App Needed

Runs on WhatsApp

The Questions

WhatsApp asks one question at a time, in order. Each answer is checked as it comes in, so a number has to be a number and a choice has to be one of the options, and it is saved with the time and the name of the person who sent it.

  1. Select Building

    Pick one

    Pick from list

    Options: Building A, Building B, Building C, Building D, Podium

  2. Excavation

    Number

    & foundation

  3. RCC Work

    Number

    Enter todays labour count

  4. Fire Fighting

    Number

    Enter todays labour count

  5. Electric Work

    Number

    Enter todays labour count

  6. Waterproofing

    Number

    Enter todays labour count

  7. Core Cut

    Number

    Enter todays labour count

  8. Gypsum Work

    Number

    Enter todays labour count

  9. Window

    Number

    Enter todays labour count

  10. Tile work

    Number

    Enter todays labour count

  11. M/S Grill Window

    Number
  12. Aluminium Windows

    Number

    Enter todays labour count

  13. Internal Doors

    Number

    Enter todays labour count

  14. Internal Painting

    Number

    Enter todays labour count

  15. SS Railing

    Number

    for balconies

  16. External texture

    Number

    & Painting

  17. GI Horizontal Fins

    Number

    Side Elevation treatment

  18. UPVC Vertical Fins

    Number

    Back Elevation treatment

  19. Plumbing

    Number
  20. Toilet False

    Number

    Ceiling

  21. Parking Area

    Number

    PU Coating

  22. Terrace Facade

    Number

    Structural fabrication for glazing

  23. ACP Cladding Facade

    Number

    terrace

  24. Elevators

    Number

    Passenger and goods lifts

  25. Signage Board

    Number
  26. Video Door Phone

    Number
  27. Entrance Lobby

    Number
  28. Letter Box

    Number

    with installation

  29. Gas Pipeline

    Number
  30. Solar PV

    Number
  31. Fire Door

    Number
  32. Fabrication Work

    Number

    Miscellaneous

  33. Department Labour

    Number
  34. Terrace Booster Pump

    Number
  35. Deep Cleaning

    Number
  36. Lightning Arrestor

    Number
  37. Anti termite

    Number
  38. Scaffolding

    Number

TaskEye records each inspection with the time and the person who did it. It does not certify equipment or guarantee safety compliance; that remains the responsibility of the site and its competent persons.

How the Daily Labour Report for Construction Sites Runs

Who fills it in

The site engineer or labour supervisor for each building.

When to use it

Once a day, after the morning muster.

What you see

Headcount by building and trade for every day, ready to compare with contractor bills and the schedule.